Free engineering sheets for telecom, fiber and ELV work, written by Telecomie. Fill them in on screen and the totals and PASS/FAIL results calculate for you, or print them for site use.
Free, no sign-up
Fillable PDF
Document-controlled
Prints on A4
Fiber optics

Fiber Link Loss Budget & Verification
Checks whether your optics will actually work over the cable plant before you order or install.
- Link loss budget: transmitter power and receiver sensitivity give the system gain, less operating margin, receiver penalties and repair margin.
- Performance margin: budget minus cable attenuation, with an automatic PASS/FAIL.
- Overload check: warns when a short link needs an attenuator.
- As-built check: compares the worst measured fiber with the budget for a final result.
- Guidance on what to change if the link fails, plus a worked example.
Use it for: designers, consultants and contractors confirming a link before procurement and signing it off after testing.

Fiber Cable Attenuation & Test Record (12 fibers)
Works out how much loss the installed cable should have, then records the field test for every fiber.
- Attenuation calculation: fiber length, connector pairs, splices and other components, at both test wavelengths.
- Pass limits carried automatically to the test record.
- 12-fiber test record in standard color order: both wavelengths, both directions, average and PASS/FAIL per fiber.
- Summary: fibers tested, passed and failed, and the highest loss.
- Test equipment set-up, reference method and an 8-point pre-test checklist.
Use it for: installers and test engineers recording OLTS / power-meter results for handover and as-built documents.
How the two sheets work together
1. Calculate attenuation
Fill in CA-001 page 1 (steps 4 to 8) for both wavelengths.
2. Check the budget
Copy the totals into LB-001, section B, and add the equipment data (steps 1 to 3).
3. Test the fibers
Record each fiber on CA-001 page 2; PASS/FAIL uses the calculated limits.
4. Sign off
Copy the worst measured fiber into LB-001, section C, for the final result.
Tip: totals calculate automatically in Adobe Acrobat Reader, Chrome and Edge. Some mobile and Mac Preview viewers do not run form calculations; the sheets can still be filled in by hand.
More sheets coming: copper (Cat6/Cat6A) test record, telecom room readiness checklist, cable labeling template and site survey checklist. Need a specific one? Tell us.
The calculation approach follows BICSI TDMM, Table 1.35. Typical allowances are per ANSI/TIA-568.3-D; always use your project specification and manufacturer data where they are tighter. The sheets are written by Telecomie in our own words and contain no text, tables or figures copied from any standard or manual. BICSI and TDMM are trademarks of BICSI; Telecomie is independent and not affiliated with or endorsed by BICSI or TIA. Free to use and share; please do not resell.